Sustainability Appraisal (SA)
To ensure that planning documents contribute to meeting the challenge of sustainable development, the planning policy system includes a process of sustainability appraisal for each Development Plan Document (DPD). A Sustainability Appraisal Report will be produced to support each DPD and Supplementary Planning Document (SPDs) in the Local Development Framework (LDF) which are likely to have a significant effect. These reports will explain how the objectives of sustainability have been taken into account in the preparation of each planning document. This process also covers the requirements of Strategic Environmental Assessment.
The Scoping Report
The first stage of sustainability appraisal is to consider the scope of the appraisal process. A Scoping Report has been produced to cover the scope of all DPDs to be included in the Test Valley LDF and SPDs which are likely to have a significant effect. It includes a review of other relevant plans, policies and programmes that relate to the local area; information on the present state of the local environment (the baseline); a discussion of the local sustainability issues and a series of sustainability objectives that must be considered when preparing DPDs.
The Council approved its Scoping Report in June 2011. This can be downloaded below.
Consultation
Consultation on the Sustainability Appraisal Report for Revised Test Valley Borough Local Plan DPD.The Council is in the process of preparing a Revised Local Plan DPD. A draft document (Regulation 18, preferred approach stage) is subject to consultation between the 8th March and 26th April 2013 – for more information see the Revised Local Plan consultation page of this website.
As set out above, a process of sustainability appraisal (including strategic environmental assessment) has been undertaken to inform the preparation of the Revised Local Plan and this is documented in the Sustainability Appraisal (SA) Report. A copy of this SA Report is provided below. The Sustainability Appraisal (including appendices and non-technical summary) is available for comment between the 8th March and 26th April 2013 (comments to be received by 4.30pm). If you would like to comment on this document, please do so using the same routes as available for the Revised Local Plan DPD. Only comments received within the consultation period can be taken into account.
Supporting Information
The Council has drawn on a range of sources of information as part of the sustainability appraisal process, including those within the Council’s evidence base. In addition, site promoters have also provided technical studies to inform consideration of options. Details and copies of the main studies that have been drawn on are available from the related page on Technical Studies referred to below.
Previous Stages
The Council produced a draft Core Strategy Development Plan Document (DPD) and a Designations DPD for public consultation in early 2012. These were accompanied by SA Reports that were also subject to public consultation. The SA Reports are provided below for information.
For further information or any queries please call 01264 368000 or email planningpolicy@testvalley.gov.uk
| File | Type | Size | Download Time |
|---|---|---|---|
| Some of the documents are in pdf format. You can download and install a free PDF reader to enable you to read and print them. Click here to download Adobe Acrobat (PDF) Reader. | |||
| Sustainability Appraisal for Local Plan DPD - Non Technical Summary (Dec 2012) | 1.3MB |
56Kbps Modem: 3 Minutes 13 Seconds Broadband : Less than 1 Minute |
|
| Sustainability Appraisal for Local Plan DPD - Main Report (Dec 2012) | 3.9MB |
56Kbps Modem: 9 Minutes Broadband : 1 Minute 3 Seconds |
|
| Sustainability Appraisal for Local Plan DPD - Appendices (Dec 2012) | 6.3MB |
56Kbps Modem: 15 Minutes Broadband : 1 Minute 43 Seconds |
|
| Sustainability Appraisal Scoping Report - Non Technical Summary | 417KB |
56Kbps Modem: 1 Minute no Seconds Broadband : Less than 1 Minute |
|
| Sustainability Appraisal Scoping Report - Main Report | 1.4MB |
56Kbps Modem: 3 Minutes 23 Seconds Broadband : Less than 1 Minute |
|
| Sustainability Appraisal Scoping Report - Appendices | 6.5MB |
56Kbps Modem: 16 Minutes Broadband : 1 Minute 46 Seconds |
|
| Sustainability Appraisal for Core Strategy DPD - Non Technical Summary | 613KB |
56Kbps Modem: 1 Minute 29 Seconds Broadband : Less than 1 Minute |
|
| Sustainability Appraisal for Core Strategy DPD - Main Report | 2.1MB |
56Kbps Modem: 5 Minutes Broadband : Less than 1 Minute |
|
| Sustainability Appraisal for Core Strategy DPD - Appendices | 3.2MB |
56Kbps Modem: 7 Minutes Broadband : Less than 1 Minute |
|
| Sustainability Appraisal for Designations DPD - Non Technical Summary | 583KB |
56Kbps Modem: 1 Minute 24 Seconds Broadband : Less than 1 Minute |
|
| Sustainability Appraisal for Designations DPD - Main Report and Appendix | 1.3MB |
56Kbps Modem: 3 Minutes 12 Seconds Broadband : Less than 1 Minute |
|
| Title | Description | Where on this site? |
|---|---|---|
| Development Plan Document (DPD) | The Revised Local Plan can be viewed here, along with details of the exhibitions and the evidence documents that were used in drafting the plan. | |
| Technical Studies Submitted by Site Promoters | A number of promoters of sites have submitted technical studies to the Council for consideration as part of the preparation of the Local Plan and the identification and assessment of strategic sites. |